<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>public space Brisbane Archives - Toowong News</title>
	<atom:link href="https://toowongnews.com.au/tag/public-space-brisbane/feed/" rel="self" type="application/rss+xml" />
	<link>https://toowongnews.com.au/tag/public-space-brisbane/</link>
	<description>News and other stories about real people, places, and events in Toowong and nearby suburbs.</description>
	<lastBuildDate>Thu, 27 Mar 2025 20:43:02 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://toowongnews.com.au/wp-content/uploads/2021/04/favicon-150x150.png</url>
	<title>public space Brisbane Archives - Toowong News</title>
	<link>https://toowongnews.com.au/tag/public-space-brisbane/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Toowong Central Redevelopment Progresses with Community Feedback</title>
		<link>https://toowongnews.com.au/toowong-central-redevelopment-progresses-with-community-feedback/</link>
		
		<dc:creator><![CDATA[Luisa]]></dc:creator>
		<pubDate>Thu, 27 Mar 2025 20:42:59 +0000</pubDate>
				<category><![CDATA[Homepage Latest News]]></category>
		<category><![CDATA[Brisbane planning]]></category>
		<category><![CDATA[community consultation]]></category>
		<category><![CDATA[mixed-use precinct]]></category>
		<category><![CDATA[public space Brisbane]]></category>
		<category><![CDATA[toowong central]]></category>
		<category><![CDATA[Toowong development]]></category>
		<category><![CDATA[Toowong housing]]></category>
		<category><![CDATA[Woolworths Toowong]]></category>
		<guid isPermaLink="false">https://toowongnews.com.au/?page_id=97586</guid>

					<description><![CDATA[<p>A major redevelopment at the former Woolworths site in Toowong is progressing, with updated plans incorporating community input on public space, design, and facilities. Read: Brisbane Boys’ College Toowong Secures Historic Podium at GPS Swimming Championships New Ownership and Ongoing Planning at Toowong Central Toowong’s former Woolworths supermarket site—spanning 1.4 hectares and bordered by High &#8230; <a href="https://toowongnews.com.au/toowong-central-redevelopment-progresses-with-community-feedback/" class="more-link">Continue reading<span class="screen-reader-text"> "Toowong Central Redevelopment Progresses with Community Feedback"</span></a></p>
<p>The post <a href="https://toowongnews.com.au/toowong-central-redevelopment-progresses-with-community-feedback/">Toowong Central Redevelopment Progresses with Community Feedback</a> appeared first on <a href="https://toowongnews.com.au">Toowong News</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>A major redevelopment at the former Woolworths site in Toowong is progressing, with updated plans incorporating community input on public space, design, and facilities.</strong></p>



<hr><p class="related"><strong><em>Read: <a href="https://toowongnews.com.au/brisbane-boys-college-toowong-secures-historic-podium-at-gps-swimming-championships/">Brisbane Boys’ College Toowong Secures Historic Podium at GPS Swimming Championships</a></em></strong></p><hr>



<h2 class="wp-block-heading"><strong>New Ownership and Ongoing Planning at Toowong Central</strong></h2>



<p>Toowong’s former Woolworths supermarket site—spanning 1.4 hectares and bordered by High Street, Sherwood Road and Jephson Street—is undergoing significant transformation.</p>



<p>Since acquiring the site in late 2023, the new private owners have initiated early planning to convert the area into a mixed-use commercial, retail and residential precinct. This follows earlier challenges, including non-compliance with prior approval conditions related to site upkeep and fencing.</p>



<p>BCC has confirmed that the current owners were not responsible for conditions before their acquisition. A change application (<a href="https://developmenti.brisbane.qld.gov.au/DocumentSearch/GetAllDocument?applicationId=A006427990" target="_blank" rel="noreferrer noopener">A006427990</a>) submitted in December 2023 is currently under assessment, with BCC emphasising that any amendments must deliver improved safety and visual amenity.</p>


<div class="wp-block-image">
<figure class="aligncenter"><img fetchpriority="high" decoding="async" width="863" height="639" src="https://toowongnews.com.au/wp-content/uploads/2025/03/1-3.webp" alt="Toowong Central plans" class="wp-image-97590" srcset="https://toowongnews.com.au/wp-content/uploads/2025/03/1-3.webp 863w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-3-300x222.webp 300w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-3-768x569.webp 768w" sizes="(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px" /><figcaption class="wp-element-caption"><em>Photo Credit: <a href="https://developmenti.brisbane.qld.gov.au/DocumentSearch/GetAllDocument?applicationId=A006427990" target="_blank" rel="noreferrer noopener">DA/A006427990</a></em></figcaption></figure>
</div>


<h2 class="wp-block-heading"><strong>Community Engagement and Design Concepts</strong></h2>



<p>Community involvement has played a central role in shaping the future of the Toowong Central site. Since early 2024, hundreds of residents have contributed via surveys and local events. Feedback focused on character, open spaces and facilities.</p>



<p>Preliminary concepts include a 2,800m² public space featuring an activated retail zone and a subtropical landscape design. One feature under consideration is an interactive “water veil” with night-time lighting. Plans also suggest fewer, taller buildings, creating space for a central town square accessible from High and Jephson Streets.</p>



<h2 class="wp-block-heading"><strong>Public vs Private: Ownership and Access</strong></h2>



<p>The proposed public space within the redevelopment is privately owned, despite being publicly accessible. This has raised questions among locals about long-term access rights and maintenance responsibilities.</p>



<p>Comparisons have been drawn to other Brisbane sites such as West Village in West End (2,118m² of public space) and Gasworks Plaza in Newstead (2,230m²), both of which operate under similar public-private arrangements.</p>


<div class="wp-block-image">
<figure class="aligncenter"><img decoding="async" width="945" height="502" src="https://toowongnews.com.au/wp-content/uploads/2025/03/3-2.webp" alt="commercial plans" class="wp-image-97591" srcset="https://toowongnews.com.au/wp-content/uploads/2025/03/3-2.webp 945w, https://toowongnews.com.au/wp-content/uploads/2025/03/3-2-300x159.webp 300w, https://toowongnews.com.au/wp-content/uploads/2025/03/3-2-768x408.webp 768w" sizes="(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px" /><figcaption class="wp-element-caption"><em>Photo Credit: DA/A006427990</em></figcaption></figure>
</div>


<h2 class="wp-block-heading"><strong>Local Sentiment and Feedback</strong></h2>



<p>Online community discussions have reflected a mix of enthusiasm and concern. Some residents have questioned whether the greenery will feel authentic and spacious compared to existing developments.&nbsp;</p>



<p>Others are eager for construction to begin, citing the need for new housing. In response to community queries, city official Penny Wolff confirmed that the number of storeys in the new buildings is yet to be determined.</p>


<div class="wp-block-image">
<figure class="aligncenter"><img decoding="async" width="1440" height="1800" src="https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2.webp" alt="Toowong Central site" class="wp-image-97589" srcset="https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2.webp 1440w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2-240x300.webp 240w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2-819x1024.webp 819w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2-768x960.webp 768w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2-1229x1536.webp 1229w, https://toowongnews.com.au/wp-content/uploads/2025/03/1-1-2-1200x1500.webp 1200w" sizes="(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px" /><figcaption class="wp-element-caption"><em>Photo Credit: <a href="https://www.facebook.com/share/p/169qBFC6hz/" target="_blank" rel="noreferrer noopener">CrPennyWolff/Facebook</a></em></figcaption></figure>
</div>


<p>BCC has stated that community input opportunities will continue once design and planning advance. Residents are encouraged to have their say. Feedback can be sent to info@theheartoftoowong.org.</p>



<h2 class="wp-block-heading"><strong>Next Steps for Toowong Central</strong></h2>



<hr><p class="related"><strong><em>Read: <a href="https://toowongnews.com.au/toowong-active-transport-projects-secure-new-funding-injection/">Toowong Active Transport Projects Secure New Funding Injection</a></em></strong></p><hr>



<p>While the current design is still in development, further updates are expected as the planning application progresses. The project aims to strike a balance between housing growth, accessibility and lifestyle quality in the Toowong area.</p>



<iframe src="https://www.google.com/maps/embed?pb=!1m18!1m12!1m3!1d3539.4714378570243!2d152.9920401!3d-27.485710200000003!2m3!1f0!2f0!3f0!3m2!1i1024!2i768!4f13.1!3m3!1m2!1s0x6b9150933083e4ab%3A0x1b385f5acf8d174e!2s23%20High%20St%2C%20Toowong%20QLD%204066%2C%20Australia!5e0!3m2!1sen!2sph!4v1743107946803!5m2!1sen!2sph" width="600" height="450" style="border:0;" allowfullscreen="" loading="lazy" referrerpolicy="no-referrer-when-downgrade"></iframe>



<p><em>Published 28-Mar-2025</em></p>
<p>The post <a href="https://toowongnews.com.au/toowong-central-redevelopment-progresses-with-community-feedback/">Toowong Central Redevelopment Progresses with Community Feedback</a> appeared first on <a href="https://toowongnews.com.au">Toowong News</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: toowongnews.com.au @ 2026-05-01 22:30:44 by W3 Total Cache
-->